0.0 General Instructions A 99/01/25 0.1 Updating this Manual 97/08/13 0.2 About BCBC and this Manual 0.3 Designers' Responsibility 0.4 Action Required of Designer 0.5 Determining Primary Control System Type 0.6 Choosing the Specification Document to be used 0.7 Using This Document To Specify Non-BCBC Projects 0.8 Acknowledgements
1.0 Lease Projects 1.1 Instructions to Designers A 99/01/05 1.2 Intentionally not used for numbering consistency 1.3 Document - Performance Specifications Section 15940 A 98/04/09 1.4 Document - Conditions of Contract Section 15915 A 98/04/09
2.0 Direct Bid Specification 2.1 Instructions to Designers A 95/12/06 2.2 Intentionally not used for numbering consistency 2.3 Document - Performance Specification A 99/01/05
3.0 New Construction - Request For Proposals (RFP) 3.1 Instructions to Designers A 95/12/06 3.2 Document - Instruction to Proponents/Proposal Form A 99/01/07 3.3 Document - Performance Specification A 99/01/07
4.0 Retrofit - Request For Proposals (RFP) 4.1 Instructions to Designers A 95/12/06 4.2 Document - Instruction to Proponents/Proposal & Accept. Form A 99/01/05 4.3 Document - Performance Specification A 99/01/07
5.0 Preapproved Systems (Graphics/Startup Logic/Points Lists) 5.1 Intent Document A 95/08/24 5A Project Summary and Table of Contents A 95/09/01 5C Cooling Systems A 97/05/22 5D Dual Fan Dual Duct Air Systems A 95/06/26 5E 100% Makeup Air Systems A 96/06/10 5H Heating Systems A 97/06/09 5M Multizone Air Systems A 97/05/14 5O Other Systems A 97/05/14 5P Pumps A 95/09/01 5S Single Zone/Terminal Reheat Air Systems A 95/10/10 5T Terminal Unit Controllers A 98/10/30 5V Variable Volume Air Systems A 97/04/14
6.0 Naming Convention A 97/05/14 7.0 Graphics Guidelines A 94/05/05 8.0 Miscellaneous Resource Material A 98/12/13 8.1 Dampers A 95/05/08 8.2 Valves A 95/05/08 8.3 ASDs A 95/05/23 8.3.1 Pump Pressure Control Cost Comparison A 94/09/12 8.4 Synchronous Belts A 95/05/25 8.5 Sequence of Operation (Description of Start Up Code) A 95/12/06 8.6 Why the CCS Manual was created A 96/06/10 8.7 7 day Test Check Sheets A 98/02/02 9.0 Optimization Guidelines (Draft) D 97/05/28 9.C Cooling Systems D 97/05/28 9.V Variable Volume Air Systems Optimization D 97/05/28 10.0 Example Document A 94/10/31