PS 1 - General
- 1.1 - General
- 1.2 - Standards and Guidelines
- 1.3 - Shop Drawings
- 1.4 - Warranty
- 1.5 - Training
PS 2 - Operator Interface
- 2.1 - Access Requirments
- 2.2 - Access Security
- 2.3 - Modem Requirements
- 2.4 - Operator Interface Software
- 2.5 - Executing the Dynamic Color Graphics
- 2.6 - Static Screen Graphics Generation Software
- 2.7 - Operator Interface Hardware Standards
PS 3 - Programmability
- 3.1 - Database Creation and Modification
- 3.2 - Alarm Definition and Processing
- 3.3 - Trends
- 3.4 - Trend Graphing
- 3.5 - Totalization
- 3.6 - Scheduling
- 3.7 - Point Definitions
- .1 - Analog Points
- .2 - Digital Points
- 3.8 - Software Controlers
- 3.9 - Operator Control Language (OCL) Capabilities
- 3.10 - OCL Editor
PS 4 - Intra-system Communication
- 4.1 - Network Communications
- .1 - Stand-Alone Panels (SAPs)
- .2 - Terminal Unit Controllers (TUCs)
- 4.2 - System Display and Processing Speed
PS 5 - Hardware Features
- 5.1 - Power Conditioning
- 5.2 - Power Failure Protection
- 5.3 - Hardware Failure Isolation
- 5.4 - Ease of Hardware Replacement
- 5.5 - Database Back-Up and Off-Line Storage
- 5.6 - Memory
- 5.7 - SAP Processing Speed
PS 6 - Field Devices
- 6.1 - General
- 6.2 - Point Type ``CRS''
- 6.3 - Point Type ``CR1''
- 6.4 - Point Type ``CR2''
- 6.5 - Point Type ``CR3''
- 6.6 - Point Type ``CS1''
- 6.7 - Point Type ``CS2''
- 6.8 - Point Type ``CV1''
- 6.9 - Point Type ``CV2''
- 6.10 - Point Type ``CV3''
- 6.11 - Point Type ``CV4''
- 6.12 - Point Type ``DA1/x''
- 6.13 - Point Type ``DA2/x''
- 6.14 - Point Type ``DA3/x''
- 6.15 - Point Type ``DA4/x''
- 6.16 - Point Type ``DDC''
- 6.17 - Point Type ``DHS''
- 6.18 - Point Type ``DPS/x''
- 6.19 - Point Type ``DTS1/x''
- 6.20 - Point Type ``DTS2''
- 6.21 - Point Type ``FRZ''
- 6.22 - Point Type ``GAS1''
- 6.23 - Point Type ``GAS2''
- 6.24 - Point Type ``GAS3''
- 6.25 - Point Type ``GAS4''
- 6.26 - Point Type ``GAS5''
- 6.27 - Point Type ``LS1''
- 6.28 - Point Type ``LS2''
- 6.29 - Point Type ``OS1''
- 6.30 - Point Type ``OTS''
- 6.31 - Point Type ``PTS1''
- 6.32 - Point Type ``PTS2''
- 6.33 - Point Type ``RHS''
- 6.34 - Point Type ``RTS1''
- 6.35 - Point Type ``RTS2''
- 6.36 - Point Type ``RTS3''
- 6.37 - Point Type ``VS1''
- 6.38 - Point Type ``VS2''
- 6.39 - Point Type ``WPS''
PS 7 - Operating System Software Point Requirements
- 7.1 - General
- 7.2 - Point Type "AL"
- 7.3 - Point Type "AS"
- 7.4 - Point Type "CO"
- 7.5 - Point Type "PG"
- 7.6 - Point Type "TL"
- 7.7 - Point Type "TZ"
- 7.8 - Point Type "V"
- 7.9 - Point Type "WS"
PS 8 - Installation Standards
- 8.1 - General
- 8.2 - Calibration
- 8.3 - Electrical Work By The Controls Contractor
- 8.4 - Electrical Work by the Electrical Contractor (DIV 16)
- 8.5 - Conduit, Wiring and Cabling
- 8.6 - Control Hardware
- 8.7 - Installation of Control Devices
- 8.8 - Installation of Actuators
PS 9 - Substantial Performance Test Procedures
- 9.1 - Overview
- 9.2 - During SEVEN (7)-Day Test
- 9.3 - Training and Demonstrations
- 9.4 - Documentation
- 9.5 - Project Acceptance
[ Previous Section || Table of Contents || Overview || Next Section ] [ Comments || Disclaimer ]