1.1 Instructions to Designers
This
section is intended to give designers specific instructions as to how to structure the
construction control system
documents
using the British Columbia Buildings Corporation standardized documents found in Section
1.0.
1.1.1 Technical Requirements
1.1.1.1 Table of Contents
Prepare a Table of Contents following the headings below.
1.1.1.2 15910 Scope
Prepare an overview and explanation of the CCS objectives as they relate to this project.
Note any particular
features
or issues which may assist the controls contractor to understand the project better.
1.1.1.3 15915 CCS Conditions of Contract
Attach this document unaltered. Any revisions to this document for the particular
project are to be noted in Section
15920
by the Consultant as described below.
1.1.1.4 15920 Project Specific Alterations to BCBC - CCS
Performance Specification
This
is where any deviations to the BCBC standard CCS Performance Specification, Section 15940,
can be made,
if
necessary. This approach is used to assist the controls contractors in focusing on issues
which may affect pricing of
the
project.
1.1.1.5 15925 Sequence of Operation
This
section is to be used to describe the sequences of operation for the items to be
controlled.
1.1.1.6 15930 Systems Summary and Points Lists
Summary Page - Prepare a summary of the points for each system using the Project
Summary Sheet.
System Points - Prepare a list of points for each system and list these
on a second Project Summary Sheet.
Alternatively,
the designer may use the Graphic/Logic/Points List- One Page Format Sheets for the BCBC
Pre-Approved
System types.
Non
DDC Points - Prepare a list of these points using the Non DDC Points List form.
These forms are located in
Section
5.O of the manual and are also available in electronic format in Microsoft Excel Version
5.0 format.
Graphics -Where graphics are to be provided, the contractor shall create the
graphics in conformance with the
BCBC
Graphics Guideline Standard, see Section 7.0 in the manual. The BCBC Pre-Approved System
type one
page
format sheets conform to the Graphics Guideline.
1.1.1.7 15940 BCBC - CCS Performance Specification - Section 1.3
Attach this document unaltered. Any revisions to this document for the particular project
are to be noted in Section
15920
by the Consultant as described above.