CC 1 - GENERAL CONDITIONS
- 1.1 - General
- 1.2 - Standards and Guidelines
- 1.3 - Shop Drawings
- 1.4 - Warranty
- 1.5 - Training
- 1.6 - Approved Products
- 1.7 - SAP Spare Point Capacity
CC 2 - INSTALLATION STANDARDS
- 2.1 - General
- 2.2 - Calibration
- 2.3 - Electrical Work By The Controls Contractor
- 2.4 - Electrical Work by the Electrical Contractor (DIV 16)
- 2.5 - Conduit, Wiring and Cabling
- 2.6 - Control Hardware
- 2.7 - Installation of Control Devices
- 2.8 - Installation of Actuators
CC 3 - SUBSTANTIAL PERFORMANCE TEST PROCEDURES
- 3.1 - General
- 3.2 - During SEVEN(7)-Day Test
- 3.3 - Training and Demonstrations
- 3.4 - Documentation
- 3.5 - Project Acceptance
[ Previous Section || Table of Contents || Overview || Next Section ] [ Comments || Disclaimer ]