CCS: Conditions of Contract Section 15915

Table of Contents

CC 1 - GENERAL CONDITIONS

1.1 - General
1.2 - Standards and Guidelines
1.3 - Shop Drawings
1.4 - Warranty
1.5 - Training
1.6 - Approved Products
1.7 - SAP Spare Point Capacity

CC 2 - INSTALLATION STANDARDS

2.1 - General
2.2 - Calibration
2.3 - Electrical Work By The Controls Contractor
2.4 - Electrical Work by the Electrical Contractor (DIV 16)
2.5 - Conduit, Wiring and Cabling
2.6 - Control Hardware
2.7 - Installation of Control Devices
2.8 - Installation of Actuators

CC 3 - SUBSTANTIAL PERFORMANCE TEST PROCEDURES

3.1 - General
3.2 - During SEVEN(7)-Day Test
3.3 - Training and Demonstrations
3.4 - Documentation
3.5 - Project Acceptance