[ Previous Page || Table of Contents || Overview || Section TOC || Next Page ]


The information displayed here is available as a Microsoft Word.doc file. Please click on this link to download this file.


INSTRUCTIONS TO PROPONENTS

Prospective proponents are directed to examine carefully the following information. Failure to follow the instructions given may result in proposal disqualification.

IP 1 - DOCUMENTS

1.1                Proposal Documents

(a) Invitation for Proposal;
(b) Instructions to Proponents;
(c) Proposal and Acceptance Form;
(d) Conditions of Contract
(e) CCS Performance Specifications and Drawings, Sections 15900 through 15940, and
(f) Addenda, if any.

IP 2 - PRE-PROPOSAL INQUIRIES

2.1               All inquiries relating to CCS drawings and specifications, shall be directed to the Energy Projects Manager.


[ Previous Page || Table of Contents || Overview || Section TOC || Next Page ]

[ Comments || Disclaimer ]