6.1 The properly completed and executed Proposal Form shall be
enclosed only in the pre-addressed envelope provided by
the Corporation. That envelope shall be
sealed and must be actually delivered into the possession of the Corporation
along with supporting technical material
as required by IP 4, at the address given in the advertised Invitation for
Proposal prior to the time and date
specified there for the closing of Proposals. The name and address of the
Proponent(s) and the project description
must appear on the face of the supplied envelope.
Proposals and other related documents
received after the advertised time and date of closing will not be considered by
the Corporation.
7.1 A Proposal Form already delivered to the Corporation may only be
revised in the manner described in IP 7.2 and to
qualify, the revision must be actually
received by the Corporation at the address given in the advertised Invitation for
Proposal prior to the time and date
specified there for the closing of Proposals. The revision must be plainly referable
to a particular Proposal.
7.2 Revisions shall be submitted only by signed letter delivered or
transmitted by facsimile machine to the number given on
the Invitation for Proposal. Only the
Proponent's entries on the delivered Proposal Form may be revised; the revision
must state only the amount by which a
figure is to be increased or decreased, or specific directions as to the exclusion
or inclusion of particular words. Any
revision which states the actual total amount of a Proposal will be rejected by the
Corporation.
8.1 The lowest or any Proposal will not necessarily be accepted.
8.2 In the event only one Proposal is received, the Corporation
reserves the right to open this proposal without reference
to the Proponent.
9.1 The successful proponent will become a Sub-Contractor to the
Mechanical Sub-Contractor. He will be required to
conform to the scheduling and Substantial
Performance date as directed by the General Contractor, and the
Mechanical Sub-contractor.
[