[ Table of Contents || Overview || Section TOC || Next Page ]
The information displayed here is available as a Microsoft Word.doc file. Please click on this link to download this file.
Prospective proponents are directed to examine carefully the following information. Failure to follow the instructions given may result in proposal disqualification.
The successful proponent will be required to sign a contract as a sub-contractor to the mechanical contractor, and will be subject to all documents governing the work. The documents governing the work include items IPI Clause 1.1 (b) through (e) and the following:
2.1 All inquiries relating to CCS drawings and specifications, shall be directed only to the Mechanical Consultant:
[
Table of Contents || Overview || Section TOC || Next Page ][ Comments || Disclaimer ]