This clause contains a list of system points, not all of which will be
applicable to this project. Refer to the "Point Type" column on the points
lists in Section 15930 to identify the points relevant to this project.
The contractor shall create and name all points indicated in the points lists.
Software points shall have the same characteristics on the graphic screens as
the real or hardware points. All software points to be located on the graphic screens as shown in the Graphic Guidelines.
Set up alarm points, if required, so that nuisance alarms are minimized. Name
as per points lists. First name in "notes" is alarmed point while second is
associated system point. Route alarms to "AR" point and to the site terminal or
modem.
Annual schedules will allow the operator to set up the statutory holidays one
year in advance. When assigned to a weekly schedule the annual schedule will
allow the weekly schedule to be overridden.
A point which allows a software controller to be set up as P, PI, or PID. The
measured variable is noted as the first name in the "notes" column of the
points lists, while the setpoint is the second. Set up as required to provide
stable operation with no "dithering" or hunting. Output units are 0% to 100%.
This is the nomenclature for the point which contains the OCL programs that
allow writing of the ``if, then, else'' statements. Set up as
detailed in the Graphic Guidelines.
Trend log points to be set up as detailed in the points lists and PS 9. Points
list trend logs have the points noted in the "notes" column separated by
commas, e.g. HCV,SAT_SP,SAT,HCP. Name as per points lists or BCBC Point Naming
Convention if not on points lists.
Set up totalizers for each digital output point in the system, except for
outputs to floating point devices. Name as per points list with units as
hours.
Variable or software points may be analog or digital as required. Set up as
required in the points lists with the proper units, and as required to comply
with the intent of the generic start-up logic.